Clinton Foundation Pros logoClinton Foundation ProsFoundation Repair · Clinton, UT
Menu
piering and underpinning in Clinton, UT

Clinton Foundation Pros

Piering and Underpinning in Clinton, UT

Piering and underpinning in Clinton, UT uses steel and helical piers to stop foundation settlement. Free estimates, straight answers on cost.

Serving Clinton and nearby communities.

Piering and underpinning is the fix for a foundation that's actually moving, not just cracked on the surface. Clinton Foundation Pros drives steel push piers or screws in helical piers to reach load-bearing soil below the clay layer that shifts with Davis County's wet springs and dry summers, then transfers your structure's weight off the unstable ground and onto something solid.

Most calls for this come from homes built during Clinton's 1990s-2020s growth run that are now settling for real: separating steps, uneven floors, or a foundation corner that's visibly lower than the rest. This is structural work, done with engineered load calculations, not a patch job.

What's included

What's Included with Piering and Underpinning

Typically included: site excavation at each pier point, pier driving or screwing to refusal depth, foundation bracket attachment, hydraulic lift to raise the structure where possible, and backfill/compaction when finished.

Optional: interior drywall or trim touch-up after lifting, drainage improvements near the repaired section, additional piers beyond the engineered minimum for extra margin.

Customer prep: clear a few feet of access around the foundation perimeter, move vehicles or landscaping near the dig points, and relocate anything stored against the exterior wall being worked on.

How it works

How Our Piering and Underpinning Process Works

  1. Load Assessment photo
    Step 1

    Load Assessment

    We analyze weight distribution to determine correct pier placement.

  2. Access Excavation photo
    Step 2

    Access Excavation

    Small excavation points are opened along the foundation perimeter.

  3. Pier Driving photo
    Step 3

    Pier Driving

    Piers are driven or screwed down until they reach stable, load-bearing strata.

  4. Load Transfer photo
    Step 4

    Load Transfer

    Brackets connect piers to the foundation to redistribute structural weight.

  5. Leveling Adjustment photo
    Step 5

    Leveling Adjustment

    Hydraulic equipment carefully raises the foundation toward its original position.

  6. Site Restoration photo
    Step 6

    Site Restoration

    Excavated areas are backfilled and compacted to match the surrounding grade.

Materials

Materials and Methods for Piering and Underpinning

  • Steel Push Piers photo

    Steel Push Piers

    Driven deep past Clinton's shifting clay layer to reach stable soil, these carry heavier structural loads with minimal future movement.

  • Helical Piers photo

    Helical Piers

    Screwed in with torque-rated equipment, a good fit for additions or lighter sections where Davis County's variable soil density changes from lot to lot.

  • Underpinning Brackets photo

    Underpinning Brackets

    Connect the pier directly to your existing footing so the load transfers cleanly instead of concentrating on one weak point.

  • Hydraulic Lift Systems photo

    Hydraulic Lift Systems

    Let us raise the structure in small, controlled increments so settled areas come back level without over-correcting.

  • Galvanized Coatings photo

    Galvanized Coatings

    Protect steel piers from corrosion over decades underground, important where seasonal moisture swings keep soil damp for months at a time.

  • Compacted Fill Material photo

    Compacted Fill Material

    Packed back around each pier to restore soil stability and prevent the access holes from becoming new settlement points.

Timeline

How Long Does a Piering and Underpinning Take?

A typical job moves from assessment to finished backfill within about a week for most Clinton homes, longer for larger pier counts.

  1. 01

    Site visit and engineering plan

    same day
  2. 02

    Permit filing

    about 3-5 business days

  3. 03

    Excavation and pier installation

    1–3 days
  4. 04

    Foundation lift and leveling

    1 day
  5. 05

    Backfill and site restoration

    1 day

Need a schedule that fits?

Get a Free Estimate

Before & after

Before and After Piering and Underpinning

  • piering and underpinning in Clinton, UT
    Before
  • piering and underpinning in Clinton, UT
    After

FAQs

Piering and Underpinning FAQs

How do piers actually stop a foundation from sinking?

Piers bypass the unstable upper soil layer and transfer your home's weight down to soil or bedrock that doesn't shift with moisture, so the foundation stops moving once the load is on the piers instead of the ground.

How many piers does a typical house need?

It depends on the foundation's weight and the extent of settlement, but most single-family homes in this area need anywhere from 6 to 14 piers along the affected section.

Does piering fix existing cracks or just stop future movement?

Piering stabilizes the structure and can lift settled sections back toward level, which often closes cracks, but separate crack injection or patching is usually done afterward to finish the surface.

How long do steel or helical piers last?

Galvanized steel piers are rated for decades of service underground and typically outlast the structure they're supporting.

Do I need a permit for pier installation?

Structural pier work requires a permit from Davis or Weber County in almost every case, and we handle that filing as part of the job.

Can piering be done without digging up my whole yard?

Access points are limited to small excavation pits at each pier location, not a full perimeter trench.

What causes a foundation to need piers in the first place?

Expansive clay soil that swells and shrinks with seasonal moisture is the most common driver locally, along with poor original compaction under the footing.

Next step

Get a Piering and Underpinning Estimate in Clinton

Call (435) 681-4655 for a free, no-pressure look at what your foundation needs. We'll walk the site, explain what we see, and give you a written scope before any work starts.

Ask about Piering and Underpinning

Tell us about the project and how to reach you.

Call (435) 681-4655